Worth Long Lead-in Hybrid Garden Hose 5/8 in. x 50 ft. -Kink Free, No Leaking, Male/Female Fittings -Heavy Duty Durable Flexible Lightweight Water Pipe -Brass Aluminum Ends for Household & Yard Use

★★★★★ 4.4 35 reviews

US$12.02
Price when purchased online
Free shipping Free 30-day returns

Sold and shipped by www.ziveao.com
We aim to show you accurate product information. Manufacturers, suppliers and others provide what you see here.
US$12.02
Price when purchased online
Free shipping Free 30-day returns

How do you want your item?
You get 30 days free! Choose a plan at checkout.
Shipping
Arrives Oct 19
Free
Pickup
Check nearby
Delivery
Not available

Sold and shipped by www.ziveao.com
Free 30-day returns Details

Product details

Management number 210771750 Release Date 2026/04/02 List Price US$12.02 Model Number 210771750
Category

Worth Garden 5/8 diameter with 50 Ft long is ideal for indoor and outdoor use, especially for gardening, farming activities. High-quality with solid Brass+Aluminum fittings and hybrid materials allows to used for tough watering chores and industrial water in all weather. It resilient built allows this garden hose easy to use in the driveway, garden, to drain a pool for winter, to flush the water heater. The APEX anti-kink technology ensures you to stop wasting water, prolonging the life of the hose to give you a reliable experience. It is a good basic piece to have in your garden.

  • All-weather Flexible: Made of hybrid material from rubber and polymer, this lawn hose is able to resist getting kinked, twisted, and coiled while being abrasion-resistant and durable; The rubber component allows the hose to remain flexible through a wide temperature range; Provides good flexibility for general lawn and garden use
  • Durable and Lightweight: Reinforced with 4 layers in the casing and a durable abrasion-resistant jacket for years of performance; The hybrid garden hose is lighter than traditional rubber hose, making it easy to maneuver around your yard; Due to its relative ease of handling, the hose is good to use around gardens, patios, and lawns
  • Weather Proof Fittings: Designed with large aluminum alloy couplings that can withstand being driven over, as well as an oversized female coupling that connects to the water source without a wrench or other tools; Fits all standard faucets and most water accessories
  • Widely Used: The Worth Garden non-kink watering hose is specifically designed to meet a wide variety of applications, such as gardening, lawn care, landscaping, commercial use, outdoor cleaning of vehicles and equipment, maintenance of building exteriors, and animal husbandry
  • Fastest Service: Please reach out to us for prompt solutions and lifetime friendly customer support; Worth garden is committed to addressing all your concerns in a professional way
Color Brown
Brand Name Worth
Unit Count 1.0 Count
Item Length 600 Inches
Item Weight 5.36 Pounds
Manufacturer Worth Garden
Material Type Rubber
Maximum Pressure 261 Pound per Square Inch
Outside Diameter 0.63 Inches
Included Components garden hose
Item Dimensions L x W 600"L x 0.63"W
Nominal Wall Thickness 0.625 inches

Correction of product information

If you notice any omissions or errors in the product information on this page, please use the correction request form below.

Correction Request Form

Customer ratings & reviews

4.4 out of 5
★★★★★
35 ratings | 14 reviews
How item rating is calculated
View all reviews
5 stars
81% (28)
4 stars
5% (2)
3 stars
2% (1)
2 stars
1% (0)
1 star
11% (4)
Sort by

There are currently no written reviews for this product.